Previous Experience
Information System Manager: Responsible for
maintenance and
configuration of company network consisting of 30 Windows XP, 2000, '98
and '95 workstations and a single Windows NT V4.0 server. Tasks
include: insuring proper back-up of mission critical data, configuring
workstations and server, troubleshooting and solving operator, software
and hardware problems, instruct users on proper use of technology, and
research and upgrade hardware and software to within budget and user's
expectations. Maintain company web site, Legend phone system and
network and phone wiring. Leader of all phases of transition to new
accounting and purchasing software including evaluation, selection,
integration, training, troubleshooting and customizing. Develop custom
VBA programs in several applications for a variety of tasks:
- Developed Microsoft Access database that tracks all
information about our mission critical AutoCAD drawings including:
drawing information, any revisions to the drawings and to whom the
drawing was sent. Extensive search and report capabilities for easy
retrieval of important information. Security permissions for limiting
user's access to editing information.
- Developed company
wide contact database using Microsoft Access and Microsoft Word and
linked it to e-mail, World Wide Web, fax and formal letter forms
- Created user interface in AutoCAD using VBA for automation
of repetitive drawing tasks.
- Created
Microsoft Excel macro to translate data output from time clock software
to be input to Accounting software saving 2 days per month of
accountant's time.
- Created AutoCAD VBA to draw objects in AutoCAD based on
data in Excel spreadsheet.
Designer: Design and detail of structure for
roller coaster in Metric and English units combining AutoCAD drawings
and Excel workbooks.
Machine Designer: One of 3 mechanical design
engineers for new
production machine. Used AutoCAD 3D solids to design and detail
innovative subassemblies as well as contribute to other's ideas.
Troubleshooter: Interaction with assembly,
manufacturing, and
customers to troubleshoot and solve existing problems as well as
improve designs for better manufacturability, assembly and operation.
| Lee and Associates |
October 1994 - June 1998 |
Production Manager: Managed production drafting
department,
oversaw time critical product releases, set and implemented computer
aided drafting standards, customized and debugged AutoCAD to improve
user's performance and instructed others in a variety of computer tasks.
Project Manager and Design Engineer: Managed
projects
designing HVAC and Plumbing systems for commercial and industrial
buildings, including those containing hazardous materials. Assisted
with projects designing refrigeration piping systems for food storage
and processing cold rooms.
| Hierath Automated Systems |
March 1992 - April 1994 |
Designer and Assembler: Standard and custom
automated assembly
systems. Managed smaller projects from concept to completion. Systems
specialized in precision net weighing and filling of valuable and/or
volatile powders or tablets.